
Scalar 100 User’s Guide 17
Figure 8 Fibre Channel Cabling in a Drive Control Path Library
Connecting the Power and SCSI Cables in a Drive Control Path
Library
1 Connect the power cord to the power outlet on the rear of the library.
2 On the bottom-most drive, connect a jumper cable to the top SCSI connector on the drive above it.
Repeat this for all of the drives.
If you have more than two drive, split the drive between SCSI buses.
3 Terminate the SCSI buses with an appropriate termintator (LVD or HVD).
4 If you have more than one SCSI bus, connect a SCSI cable between the bottom drive and the host.
Refer to
Figure 9 on page 18.
Komentáře k této Příručce